The Control Concepts LD includes
discussion on how the control system interacts between turbine components and
operators during all phases of turbine operation. Topics include discussion of the FSR split,
ready-to start requirements, the start-up sequence, speed/load control,
temperature control, combustion monitor, gas fuel operation, and liquid fuel
operation. Discussions move from the
determination of the control signal to the positioning of the valves. Content will also include detailed alarm
response discussions.